Foster Hangar Expansion

This project scope includes the addition and renovation to increase the square footage of the facility to create a paint booth; a paint booth with the capabilities of painting a 737 AirBus, with additional room to spare. Also included within the facility will be an extensive air system with a new Kaeser air compressor. In addition to the compressed air system there will also be a waste water sump system with a Water Eater System to reduce the waste generated during the painting process. Within the existing hangar, our team will also be renovating and installing an industrial curtain system to sectionalize the facility.


Project Build Blog

                    We have finished sheeting the exterior walls and roof of the building, and are now installing the trim, gutters, and…

At the Lakeland Linder Regional Airport, the slab has been poured and trench drain installed. We have started erecting the metal building and anticipate completion by the end of January. Please continue checking our website to view the completed metal building.

Foundation excavations at the Lakeland Linder Regional Airport just prior to preparing the slab for a concrete pour. We anticipate starting to erect the hangar within the first week of December. Be sure to check our website next month for the finished concrete slab and the start of the building erection.